Integrating Design and Detailing
For Faster Project Delivery

Integrated Design Detailing is a streamlined approach that enhances construction efficiency by initiating detailing during the structural design phase.

This methodology ensures seamless collaboration between structural engineers and detailers, reducing delays and improving project timelines

30%-40%

Faster than traditional detailing

Cut Costs and Delays with Integrated Design Detailing

01

Early 3D modeling significantly accelerates project timelines and lowers costs.

02

Overlapping design and detailing phases reduces project duration by 30-40% compared to traditional workflows.

03

Detailing begins when the design is approximately 50% complete, allowing for accurate material reports and drawings for bidding purposes.

04

After fabricator selection, models and documents are customized to meet their standards.

Accelerating Project Schedules

By integrating the design and detailing phases, and eliminating time-consuming steps in the  workflow, project delivery timelines are significantly shortened.

30%-40%

Faster than Traditional Detailing

Project Schedule

See how Integrated Design Detailing works

Structural Engineers and Detailers working simultaneously during the design phase enable an integrated workflow that significantly accelerates project timelines.

Integrated Design Detailing delivers benefits for all project stakeholders

Owners, engineers, Contractors, and Fabricators all get benefits from this methodology.

Owners

  • Anticipated revenue generation as the building can be built sooner

  • More accurate quotes from contractors, as quotes are based on actual material reports and erection drawings

  • Significant improvements on the project schedule.

Engineers

  • Steel RFIs are managed and resolved during design phase.
  • Control of the detailing Contract.
  • No delays resolving issues when the design drawings have been released to fabricators.

Contractors

  • Improvement in quote accuracy due to complete information regarding materials.
  • Other disciplines can use the model to accommodate mechanical, electrical and plumbing components.
  • Improvements on schedules results in lower costs.

Steel Fabricators

  • Quotes can be more accurate and competitive as they are based on actual constructible model and bill of materials.

  • It is no necessary to manage RFIs for detailing.

  • Fabrication can start after 5 days the contract is awarded, faster delivery means more business.

Read our “Integrated Design Detailing” Brochure

To learn more about “Integrated Design Detailing” and how your business can benefit from working with Endproc.

We are a BIM company

providing constructible STRUCTURAL SOLUTIONS

350+

Successfully Completed Projects

20k +

Man hour capacity

6+

States and provinces.
where we work

10+

Years in Business